At the moment, we do not have a way to change the base rate of a rate as it is permanent.
You will have to delete and recreate the rate then assign the correct base rate.
At the moment, we do not have a way to change the base rate of a rate as it is permanent.
You will have to delete and recreate the rate then assign the correct base rate.