To change the order of rates in the Booking Engine, follow these steps:
- Navigate to the Main Menu > Settings > Services > choose the stay service the rates are in.
- Click on Rates > choose the rate you want to position in the listing.
- In the Detail tab find the field Ordering.
- Fill in the number of the position. The lower the number, the higher the rate is in the list.
For example: if the non-refundable rate has value -1 and the Best Available Rate, or BAR, rate has value 0, the rates appear in the following order:
- Non-refundable rate.
- BAR rate.
Note: the ordering value also affects the position of the rates in Mews Operations and the Booking Engine application programming interface, or API.